April 22, 2026

Remove the neck

Writing image

Roof

When the bottleneck is the norm, there are two ways to deal with it.

Option easy: add capacity. Accept the neck is too damn small and do what it takes to open it out – which means more of the same, as in more machines, more people, more.

Option harder: remove the neck. Look out to see if the issue is more about outgrown systems and processes – because what was a good way of dealing with the old normal drip-drip-drip will never be smart in the new normal flood-flood-flood – or, just possibly, and we’re spitballing here, an outgrown skillset – where the person and their practices are no longer the right person with their practices.

In short, buy your way out of the short-term problem or smart your way out of it long-term.

Or, just maybe, do a little bit of both.

Skippy strategy: The bottleneck and the cause.

Category:
Skippiness